The MIIS Eprints Archive

Slag ladle insulation

Stokes, N. and Jenkins, D. (1994) Slag ladle insulation. [Study Group Report]

[img]
Preview
PDF
418kB

Abstract

Slag from Pasminco's lead-zinc smelters, which is rich in zinc, is transferred in thirteen tonne capacity ladles from the blast furnace to the slag fuming furnace. The cycle time is about three hours. The Study Group was asked to examine whether heat could be conserved by some insulation strategy, without at any stage overheating the steel of the ladle.

Item Type:Study Group Report
Problem Sectors:Transport and Automotive
Materials
Study Groups:Australian and New Zealand Mathematics in Industry Study Group > MISG 1994
Company Name:Pasminco
ID Code:472
Deposited By: Dr Kamel Bentahar
Deposited On:15 Dec 2011 16:03
Last Modified:29 May 2015 20:05

Repository Staff Only: item control page