Items where Study Group is "US Workshop on Mathematical Problems in Industry > MPI 28 (Delaware, USA, Jun 11-15, 2012)"
Number of items at this level: 3. Bloom EnergyDiakite, I. and DiLorenzo, T. and Edwards, D.A. and Emerick, B. and Fang, R. and Jing, F. and Li, L. and Miller, J. and Panaggio, M. and Peace, A. and Raymond, R. and Sun, Y. and Wolff, E. and Zumbrum, M. (2012) Fuel Cell Assembly Process Flow for High Productivity. [Study Group Report] Pall CorporationTilley, B. and Witelski, T. (2012) Modeling industrial coalescers: droplet dynamics. [Study Group Report] Standard and Poor'sBhatt, G.S. and Brimlow, J. and Estervig, B. and Caraba, E. and Ghavami, A. and Fan, S. and Ho, N. and Gong, H. and Lenhoff, I. and Huang, Z. and Liang, C. and Sanders, J. and Jin, S. and Wang, Y. and Rossi, R. and Yao, G. and Takeuchi, M. and Yao, L. and Tenali, G. and Duffy, D. and Varga, K. and Fok, P.-W. and Zhao, T. and Please, C.P. (2012) Problem from Standard and Poor’s. [Study Group Report] |